Telefon ústředna: +420 359 010 111
94cb92cc223edc8935523c285f5172fe.jpg

The water and sewer rates for 2021 have been approved by the General Assembly of The Water Management Association of the West Bohemia Region, the owner of the infrastructure, on 27.11.2020. - see the list of member municipalities.

Variable part (payments for water consumption)

Prices per 1m3 in CZK (10 % VAT)

water rate sewer rate total
excl. VAT incl. VAT excl. VAT incl. VAT excl. VAT incl. VAT
38,10 41,91 29,46 32,41 67,56 74,32

Fixed part (annual payment following the size - nominal water flow - of the water meter)

Prices in CZK per year (10 % VAT)

billing water meter - nominal flow - Qn [m3/h] water rate sewer rate total
excl. VAT incl. VAT (10%) excl. VAT incl. VAT (10%) excl. VAT incl. VAT (10%)
1,5 978,55 1076,40 918,95 1 010,85 1 897,50 2 087,25
2,5 1 665,41 1 831,95 1 577,59 1 735,35 3 243,00 3 567,30
3 2 072,09 2 279,30 1 973,82 2 171,20 4 045,91 4 450,50
3,5 2 515,36 2 766,90
2 409,77 2 650,75 4 925,13 5 417,65
5 4 046,95 4 451,65 3 929,86 4 322,85 7 976,81 8 774,50
6 5 215,77 5 737,35
5 104,95 5 615,45 10 320,72 11 352,80
7 6 492,27 7 141,50
6 397,14 7 036,85 12 889,41 14 178,35
10 10 896,77 11 986,45
10 909,32 12 000,25
21 806,09 23 986,70
15 19 878,27 21 866,10
20 270,32 22 297,35 40 148,59 44 163,45
20 30 601,50 33 661,65
31 617,68 34 779,45 62 219,18 68 441,10
25 42 838,55 47 122,40
44 714,09 49 185,50 87 552,64 96 307,90
30 56 436,77 62 080,45
59 397,50 65 337,25 115 834,27 127 417,70
35 71 280,14 78 408,15
75 546,64 83 101,30
146 826,78 161 509,45
40 87 281,86 96 010,05
93 068,45 102 375,30 180 350,31 198 385,35
50 122 482,32 134 730,55
131 929,05 145 121,95
254 411,37 279 852,50
60 161 596,95 177 756,65
175 500,45 193 050,50
337 097,40 370 807,15
75 226 906,50 249 597,15
248 923,77 273 816,15
475 830,27 523 413,30
80 250 322,59 275 354,85
275 412,45 302 953,70
525 735,04 578 308,55
90 299 474,64 329 422,10
331 244,95 364 369,45 630 719,59 693 791,55
100 351 580,09 386 738,10
390 727,14 429 799,85
742 307,23 816 537,95
120 464 090,86 510 499,95
520 016,41 572 018,05
984 107,27 1 082 518,00

Wastewater form other sources (rainwater, groundwater etc. - CZK/m3)

variable part fixed part total
excl. VAT excl. VAT excl. VAT
29,46 4,13 33,59

Average prices (average prices recalculated from the total revenue of the operator and the billed volume of drinking/used water - CZK/m3)

water rate sewer rate total
excl. VAT incl. VAT excl. VAT incl. VAT excl. VAT incl. VAT
43,23 47,55 33,59 36,95 76,82 84,50

Movie about Vodakva